
Renovation of the Hungarian State Opera
Budapest, Hungary | 2017-2022 | 27 000 m² | Completed
Designed by Miklós Ybl and opened in 1884, the Hungarian State Opera is one of Europe’s most distinguished historic opera houses. Situated within the UNESCO World Heritage setting of Andrássy Avenue, the building is a masterpiece of Hungarian Neo-Renaissance architecture, in which architectural composition, decorative arts and theatrical operation were conceived as an integrated whole.
The comprehensive renovation of the building, which has remained in continuous use for more than 140 years, aimed to preserve its historic character while bringing its technical systems, stage technology and audience facilities up to 21st-century standards. Designed by ZDA, the project was founded on a precise understanding of Ybl’s original architectural intentions and their continuation through contemporary means.
During the restoration, the auditorium, ceremonial reception rooms and principal circulation spaces regained their original colour schemes and richness of detail based on archival research, conservation studies and material analyses. Later alterations were assessed carefully in each case: where appropriate, interventions sought to recover the historic condition, while the layers resulting from the building’s continuous use were also evaluated and respected.
In parallel with the restoration of the historic interiors, the stage technology, building services, acoustics, fire-safety systems and backstage areas were comprehensively renewed. New auditorium seating, modern lighting, energy-efficient building systems and accessibility measures were discreetly integrated into the historic setting. The renovation also opened up the audience circulation system, which had originally separated visitors according to ticket category, allowing the Opera House to function today as a more unified and democratic public building.
The renovation of the Hungarian State Opera demonstrates how a 19th-century theatre of outstanding heritage value can be transformed into a contemporary, internationally competitive performing arts institution. The project combined the restoration of historical authenticity with the complete renewal of the building’s technical systems, while re-establishing the Opera House’s original acoustic qualities, atmosphere and urban significance.
Lead architects
Zoboki Gábor DLA habil., Turi Zoltán, Borzák Richárd
Architects
Antmann Somogyi András, Bánsági Dávid, Besey Judit, Fekete Attila, Galgóczki Bonifác, Iványi Réka, Jaczó Anna, Kacsoh Gábor, Kakas László, Kormányos Anna, Lencsés Albert, Molnár Zoé, Orlovits Balázs, Poller Mónika, Reppert Béla, Révai Virág, Rutkai Pál, Seidl Krisztián, Silvester Csaba, Szlabey Balázs, Szontág Júlia, Timár András, Fekete Ferenc, Molnár Máté, Sztankó Gerda
Árvainé Szabó Valéria, Csöndes-Albert Fatime, Miklós Bernadett, Palásti Ildikó
Client
W-É-L Opera Konzorcium
Project coordinator
Farkas Dóra
Main design partners and consultants
Mezős Tamás (heritage), Fellegi Eszter, Révész Eszter (textile design), Branczik Márta (history of art), Tompai Zsuzsa (stage technology), Szabó Henriett (accessibility design), ZED Építész Stúdió, Czakó, Stúdió Kvarc, Demeter Design Studio, Tripartitum, FRT Raszter, STR-Design, Kamarások, 2 RABB, Körös Consult, Hungaroproject Mérnökiroda, Vár-Kert Műszaki Tervezési Kft., VÁROS-TEAMPANNON, Design Studio, Pro Almond, STUDIO DAP, Entel, Arató Akusztika, The Greypixel, Mentartis, MadebyLight, Graphasel
Designed by Miklós Ybl and opened in 1884, the Hungarian State Opera is one of Europe’s most distinguished historic opera houses. Situated within the UNESCO World Heritage setting of Andrássy Avenue, the building is a masterpiece of Hungarian Neo-Renaissance architecture, in which architectural composition, decorative arts and theatrical operation were conceived as an integrated whole.
The comprehensive renovation of the building, which has remained in continuous use for more than 140 years, aimed to preserve its historic character while bringing its technical systems, stage technology and audience facilities up to 21st-century standards. Designed by ZDA, the project was founded on a precise understanding of Ybl’s original architectural intentions and their continuation through contemporary means.
During the restoration, the auditorium, ceremonial reception rooms and principal circulation spaces regained their original colour schemes and richness of detail based on archival research, conservation studies and material analyses. Later alterations were assessed carefully in each case: where appropriate, interventions sought to recover the historic condition, while the layers resulting from the building’s continuous use were also evaluated and respected.
In parallel with the restoration of the historic interiors, the stage technology, building services, acoustics, fire-safety systems and backstage areas were comprehensively renewed. New auditorium seating, modern lighting, energy-efficient building systems and accessibility measures were discreetly integrated into the historic setting. The renovation also opened up the audience circulation system, which had originally separated visitors according to ticket category, allowing the Opera House to function today as a more unified and democratic public building.
The renovation of the Hungarian State Opera demonstrates how a 19th-century theatre of outstanding heritage value can be transformed into a contemporary, internationally competitive performing arts institution. The project combined the restoration of historical authenticity with the complete renewal of the building’s technical systems, while re-establishing the Opera House’s original acoustic qualities, atmosphere and urban significance.
Europa Nostra Award, Winner, Conservation & Adaptive Reuse Category 2026
Big See, Public, commercial, cultural buildings and infrastructure buildings category, 2024
FIABCI Hungary, Culture and Heritage Conservation Category, Grand Prize, 2023
Lead architects
Zoboki Gábor DLA habil., Turi Zoltán, Borzák Richárd
Architects
Antmann Somogyi András, Bánsági Dávid, Besey Judit, Fekete Attila, Galgóczki Bonifác, Iványi Réka, Jaczó Anna, Kacsoh Gábor, Kakas László, Kormányos Anna, Lencsés Albert, Molnár Zoé, Orlovits Balázs, Poller Mónika, Reppert Béla, Révai Virág, Rutkai Pál, Seidl Krisztián, Silvester Csaba, Szlabey Balázs, Szontág Júlia, Timár András, Fekete Ferenc, Molnár Máté, Sztankó Gerda
Árvainé Szabó Valéria, Csöndes-Albert Fatime, Miklós Bernadett, Palásti Ildikó
Client
W-É-L Opera Konzorcium
Project coordinator
Farkas Dóra
Main design partners and consultants
Mezős Tamás (heritage), Fellegi Eszter, Révész Eszter (textile design), Branczik Márta (history of art), Tompai Zsuzsa (stage technology), Szabó Henriett (accessibility design), ZED Építész Stúdió, Czakó, Stúdió Kvarc, Demeter Design Studio, Tripartitum, FRT Raszter, STR-Design, Kamarások, 2 RABB, Körös Consult, Hungaroproject Mérnökiroda, Vár-Kert Műszaki Tervezési Kft., VÁROS-TEAMPANNON, Design Studio, Pro Almond, STUDIO DAP, Entel, Arató Akusztika, The Greypixel, Mentartis, MadebyLight, Graphasel














